6"Dia. Miter Plain Chrome Exhaust Stack

6 inch Miter Plain Made in America Chrome Stacks

Features:

  • Mirror-like Chrome Finish
  • Nickel Plated: 3 Layers
  • Improved Adhesion & Corrosion Resistance
  • Highest Quality Truck Exhaust Stack

Step 1: Choose Brand

NOT "Made in USA". High Quality Super Premium Stacks are Chrome plated with Triple Nickel and Double Chrome.

✓ Most Stacks are IN STOCK!



Step 2: Choose Length

  

"Made in North America"

✓ Most Stacks are IN STOCK!



Step 2: Choose Length

  

"Made in USA"

⚠ Lincoln Chrome Lead Time: 8 to 10 weeks!



Step 2: Choose Length

  


See Expected Lead Time For Lincoln Stacks Here


Availability:Choose Brand on Step 1Shipping:See Cart
Tax:PaidWeight:9 lbs.
Model No.:Several
ManufacturerAmerican, Trux, Lincoln Chrome
Returns30 days w/ 25% Restocking Fee




Exhaust Stack Tip & End

miter stack

⚠ Note for Lincoln Chrome Stacks or Exhaust Kits:

It is important to be aware that the Forwarder Company imposes an Extra charge of $160.00 for Lift Gate Services on orders that contain 84" up to 120" Lincoln Chrome Stack or Full Exhaust Kits and are being shipped to Residential Addresses.

TO AVOID THIS FEE, ship your order to Commercial Addresses instead.



6" diameter Chrome Truck Exhaust Stacks with Miter tip & Plain End. The exhuast stack uses a flawless material thats meets a standard twice that of ASTM specifications. The stack material undergoes multistep polishing for a smooth surface, a multiple-pass cleaning treatment, a three layers of nickel plating for improved adhesion and corrosion resistance and, finally, a layer of chrome.

Traditional Chrome discolors between 600-700°F.

Available Exhaust Stack Lengths:

  • 24" to 120" (2 to 10 ft.)


Note: Plain end has a 6" outside diameter (works with seamless design elbow).





⚠ Please Note: The pandemic brought the American steel industry to its knees last spring, forcing manufacturers to shut down production as they struggled to survive the imploding economy. But as the recovery got underway, mills were slow to resume production, and that created a massive steel shortage.

Domestic steel mills that idled furnaces last year amid fears of a prolonged pandemic-induced economic downturn have been slow in ramping up production, despite a recovery in demand for cars and trucks, appliances, and other steel products.

The delays in stack production can be significant and it is possible those delays might cause an extended lead time.


Expected Lead Time for Lincoln Chrome Stacks

5" Stacks6" Stacks7" Stacks8" Stacks
Miter8-10 weeks8-10 weeks6-8 weeks6-8 weeks
Curve8-12 weeks8-12 weeks8-12 weeks8-12 weeks
Bullhorn16-20 weeks16-20 weeks12-16 weeks12-16 weeks
Flat Top8-10 weeks8-10 weeks6-8 weeks6-8 weeks
Short 308-12 weeks8-12 weeks8-12 weeks8-12 weeks
West Coast Curve8-12 weeks8-12 weeks8-12 weeks8-12 weeks
Diablo16-20 weeks16-20 weeks12-16 weeks12-16 weeks

⚠ Please Note: It's possible the Lead Time could be doubled. We apologized but we have no control of the Lead Time.


-True Support Team


See Chrome Stack Technical page See Chrome Stack (FAQ) Frequently Asked Questions

More 6 Inch Plain Truck Stacks