7" Diameter Chrome Exhaust Stack
Choose your 7" Chrome Exhaust Stacks, based on the Type of Tip and End needed. Available Tip Types includes Miter, Curve, Bullhorn, Flat Top, Short 30, West Coast Curve, and Diablo with a length of 24" up to 120". Manufactured by Lincoln Chrome and all chrome stacks are "Made in USA". You can also choose either Plain, Expanded, Reduced Plain, and Reduced Expanded end types.
Note: Plain end has a 7" outside diameter (works with seamless design elbow). Expanded end has a 7" inside diameter. Reduced Plain end has a 5" outside diameter (slides into muffler). Reduced Expanded end has a 5" inside diameter (slides over 5" outside diameter elbow).
MITER
CURVE
BULLHORN
FLAT TOP
SHORT 30
WEST COAST CURVE
⚠ Please Note: The pandemic brought the American steel industry to its knees last spring, forcing manufacturers to shut down production as they struggled to survive the imploding economy. But as the recovery got underway, mills were slow to resume production, and that created a massive steel shortage.
Domestic steel mills that idled furnaces last year amid fears of a prolonged pandemic-induced economic downturn have been slow in ramping up production, despite a recovery in demand for cars and trucks, appliances, and other steel products.
The delays in stack production can be significant and it is possible those delays might cause an extended lead time.
-True Support Team
Expected Lead Time for Lincoln Chrome Stacks
5" Stacks | 6" Stacks | 7" Stacks | 8" Stacks | |
Miter | 8-10 weeks | 8-10 weeks | 6-8 weeks | 6-8 weeks |
Curve | 8-12 weeks | 8-12 weeks | 8-12 weeks | 8-12 weeks |
Bullhorn | 16-20 weeks | 16-20 weeks | 12-16 weeks | 12-16 weeks |
Flat Top | 8-10 weeks | 8-10 weeks | 6-8 weeks | 6-8 weeks |
Short 30 | 8-12 weeks | 8-12 weeks | 8-12 weeks | 8-12 weeks |
West Coast Curve | 8-12 weeks | 8-12 weeks | 8-12 weeks | 8-12 weeks |
Diablo | 16-20 weeks | 16-20 weeks | 12-16 weeks | 12-16 weeks |
⚠ Please note that it's possible the Lead Time could be doubled. We apologized but we have no control of the Lead Time.