6"Dia. Diablo Pair Reduced Expanded Chrome Exhaust Stack
Features:
- High Quality Chrome Finish
- Triplex Nickel for Adhesion & Corrosion Resistance
- Polished Smooth Surface
- Multiple-pass Cleaning Treatment
"Made in USA"
⚠ Lead Time: 16 to 20 weeks!
Availability: | See Shipping Guide | Shipping: | See Cart |
Tax: | Paid | Weight: | 9 lbs. |
Model No.: | 706RD-LLL-1103 706LD-LLL-1103 | ||
Manufacturer | Lincoln Chrome | ||
Returns | 30 days w/ 25% Restocking Fee |
Exhaust Stack Tip & End
⚠ Note for Lincoln Chrome Stacks or Exhaust Kits:
It is important to be aware that the Forwarder Company imposes an Extra charge of $160.00 for Lift Gate Services on orders that contain 84" up to 120" Lincoln Chrome Stack or Full Exhaust Kits and are being shipped to Residential Addresses.
TO AVOID THIS FEE, ship your order to Commercial Addresses instead.
"Made in America" Chrome Exhaust Stacks with a 6" diameter, Diablo(Pair) tip, and Reduced to 5" inside diameter Expanded End. Choose lengths from 30" to 120" (2.5 to 10 ft.).
The exhuast stack uses a flawless material thats meets a standard twice that of ASTM specifications. The stack material undergoes multistep polishing for a smooth surface, a multiple-pass cleaning treatment, a three layers of nickel plating for improved adhesion and corrosion resistance and, finally, a layer of chrome.
Note: Reduced Expanded end has a 5" inside diameter (slides over 5" outside diameter elbow).
⚠ Please Note: The pandemic brought the American steel industry to its knees last spring, forcing manufacturers to shut down production as they struggled to survive the imploding economy. But as the recovery got underway, mills were slow to resume production, and that created a massive steel shortage.
Domestic steel mills that idled furnaces last year amid fears of a prolonged pandemic-induced economic downturn have been slow in ramping up production, despite a recovery in demand for cars and trucks, appliances, and other steel products.
The delays in stack production can be significant and it is possible those delays might cause an extended lead time.
Expected Lead Time for Lincoln Chrome Stacks
5" Stacks | 6" Stacks | 7" Stacks | 8" Stacks | |
Miter | 8-10 weeks | 8-10 weeks | 6-8 weeks | 6-8 weeks |
Curve | 8-12 weeks | 8-12 weeks | 8-12 weeks | 8-12 weeks |
Bullhorn | 16-20 weeks | 16-20 weeks | 12-16 weeks | 12-16 weeks |
Flat Top | 8-10 weeks | 8-10 weeks | 6-8 weeks | 6-8 weeks |
Short 30 | 8-12 weeks | 8-12 weeks | 8-12 weeks | 8-12 weeks |
West Coast Curve | 8-12 weeks | 8-12 weeks | 8-12 weeks | 8-12 weeks |
Diablo | 16-20 weeks | 16-20 weeks | 12-16 weeks | 12-16 weeks |
⚠ Please Note: It's possible the Lead Time could be doubled. We apologized but we have no control of the Lead Time.
-True Support Team
See Chrome Stack Technical page See Chrome Stack (FAQ) Frequently Asked Questions